"The board" and "Director" mean WTC MUD #1. A dagger (†) marks a director who also held a role in the Anderson Mill West Neighborhood Association; the table of association officers gives the dates.
A footbridge for the Sun Chase trail. In April 2017 the Infrastructure Committee asks the engineer to review a bridge across the drainage channel in Sun Chase Park. On February 20, 2019 the district board approves $45,700 for a steel footbridge, 4-1. Director Zervigon† moves; Director Franke† seconds. Ayes: Franke†, Medrano, Norton Ramirez, Zervigon†. Director Rocco† asks "if there was a less expensive way to install the bridge." The engineer replies that a bridge of this span is hard to place without a pier. A pier is a risk to water flow in the channel. Director Rocco† votes no.
Budget list. The district's parks beautification list for fiscal year 2019-2020 has an item dated September 11, 2019: "Sunchase Playscape Removal (Need Estimate)." The amount set is $0.00. September 11, 2019 was the board's budget meeting. The minutes of that meeting do not mention the playscape.
The operator's report says the district's Parks Committee met on January 8 and "Discussed dismantle of Sun Chase Playscape - we have a potential school that is interested."
Manager's report. The playscape comes up under agenda item 7, the district manager's report. The minutes for item 7 say: "The Sun Chase park playscape will be dismantled and donated to a local school. Dir. Franke† envisions a new design for the space."
On the recording, a speaker asks, "Is is the parks committee thinking about replacing it with something later?" The answer: "Yes, we are." The plan stated is to "remove uh the playscape in Sun and then we are going to come up with a different design for that space." Then: "The reason I ask is that there often are children on it." The replies include "But there's bigger parks down the road" and "We're thinking about doing something completely different, but we have to We're doing some research right now." Asked "You going to repurpose it?", a speaker answers: "Yes. We're repurposing the space." On its condition, one speaker says "It's usable." Asked whether it was worth $300 or more, another says, "I think it's going to cost us more than $300 to repair it or remove it." The item is put on the next agenda. No vote is taken.
Agenda. The agenda has 31 items. Item 12 is the "Report from the Parks Subcommittee." The playscape is item 30: "Declaring Sunchase playscape equipment as surplus property; authorization to sell Sunchase playscape equipment." (Surplus property is property the district no longer needs.)
Public comment. A resident tells the board that item 30 "has never been public publicly discussed" and that "Nobody in our neighborhood knows why this is happening." A speaker replies: "We've talked about it a few times. Yeah. Last couple of meetings." A question follows about which meeting discussed why it was being removed. The reply does not name a meeting.
Footbridge payment. The board authorizes payment of $48,700 to Westar Construction for "footbridge installation, side-channel grading, and silt removal" at Sun Chase Park, 5-0 (Zervigon† moves; Medrano seconds). It also allocates $250 for a Sun Chase bridge grand opening on March 7, 2020, 5-0 (Franke† moves; Norton Ramirez seconds). During the engineer's report, speakers discuss soil left from the bridge work. One says the contractor "accumulated a lot of soil from digging that that slope." Speakers suggest using it for a mound "by the picnic bench" at the back of the park, "like we did in the front of the park." Then: "Or we can have another mound when the playscape goes away. If it goes away."
Discussion and vote. During the parks report, staff say the playscape will be donated to an elementary school and picked up that Saturday. On the recording a speaker then says, "We'll just jump to 30." The minutes record the two votes under item 12 and no action under item 30. The recording of this part runs about ten minutes. Points from the recording:
Two motions pass 5-0, both moved by Director Franke† and seconded by Director Norton Ramirez: one declares the playscape surplus, and one donates it "as-is with no warranty" to Buck Holtz Elementary School. Ayes: Franke†, Medrano, Norton Ramirez, Rocco†, Zervigon†. The minutes also record: "Dir. Franke† noted that the playscape is damaged and it would be costly and difficult to repair."
Scheduled pickup. The February 19 minutes say: "Ms. Hester said that the Sun Chase playscape will be donated to a nearby elementary school and is set to be taken away on Saturday." That Saturday was February 22. No record confirms the pickup date. On March 25 a resident refers to "the playground equipment that was removed."
Bridge grand opening. The board funded a $250 grand opening for the new Sun Chase footbridge on this date. Later meetings refer to the "bridge opening" and the "grand opening celebration."
COVID-19: parks closed. At a special meeting the operator explains that areas "where people tend to congregate (parks, basketball courts, tennis courts, etc.) are closed." On the recording: "our parks are closed. The equipment is closed."
HOA comment. The president of the Hunter's Glenn HOA tells the board that neighbors asked about "the playground equipment that was removed": "where did it go? What's happened?" She asks the district to "consider putting some sort of playground equipment in there for our children."
The operator reports caution tape "on all playscapes in accordance with the closing of the parks and libraries."
Bridge handrails. The board approves $8,200 to Westar Construction for entry handrails and concrete footers at the Sun Chase bridge. Director Medrano moves; Director Zervigon† seconds. On August 19, 2020 the engineer reports the handrails installed, and the board approves the $8,200 payment.
First reopening. The operator reports that the tennis courts "have been reopened" with limits on players. Playgrounds are not part of this reopening.
Removal reported complete. During the accountant's report, a speaker tells the accountant that "the Sun [Chase] Playscape removal was completed and it didn't cost us anything." A speaker then adds, "We had a school come in and take it." The operator's monthly reports for March to July 2020 do not report the removal as done. The remark does not give the removal date.
Vote to reopen playgrounds. The board votes to open district parks in "Phase II," including "playgrounds sanitized prior to opening." Director Norton Ramirez moves; Director Franke† seconds. Ayes: Franke†, Medrano, Norton Ramirez, Rocco†, Zervigon†. In October staff report that the playscapes at district parks were sanitized on September 25. A district news post dated September 24, 2020 says playgrounds would open on Saturday, September 26. Sun Chase has no play equipment at this time.